Tidewater Home Improvement LLC
Scope of Work & Estimate
2868 W Landing Rd
$20,893.63 Estimate
2868 W Landing Rd · Virginia Beach, VA
3 Day Promotional Discount
View PDF Accept & Pay Deposit Expires: 09/09/2026
Project Overview
Customer: Christopher Stankus
Project: Crawlspace Waterproofing & Encapsulation
Address: 2868 W Landing Rd, Virginia Beach, VA
Crawlspace: 1,914 sq ft
Drainage: 190 linear ft interior
Estimate #: 1291
Included Scope
CLEAN UPDebris Removal & Old Barrier RemovalIncluded
  • Remove debris and the existing mud-covered vapor barrier across the crawlspace (1,914 sq ft)
  • Haul away from the home
VAPOR BARRIERVapor Barrier White 10 milIncluded
  • New WHITE 10-mil vapor barrier sheeting across the crawlspace floor
  • Seams overlapped and secured to block ground moisture (1,914 sq ft)
STRUCTURALPower Post & BeamIncluded
  • Remove 1 existing man-made pier and replace with a power post jack on a proper footing
  • Install ~3 linear ft of beam — (3) 2x8s sandwiched together
VENTSSeal VentsIncluded
  • Seal crawlspace vents
ACCESSCrawlspace DoorIncluded
  • Install a new PVC crawlspace door
DRAINAGEInterior Trench DrainIncluded
  • Interior trench drain along the crawlspace (190 linear ft)
  • Discharge line run 65 ft to the exterior, away from the foundation
  • Water from the crawlspace is discharged to the drain field previously created by the customer
SUMP PUMPSSump Pumps (2)Included
  • Two Zoeller M53 sump pumps with basins
  • Move water out of the crawlspace before it reaches the barrier
MOISTUREDehumidifier Aprilaire E100Included
  • Aprilaire E100 dehumidifier with condensate pump
  • Holds the crawlspace at a dry level year-round
ELECTRICALElectrical Outlets (3)Included
  • 3 new outlets — 1 for the dehumidifier, 2 for the sump pumps
GENERALGeneral ConditionsIncluded
  • Jobsite protection and daily clean-up
Project Samples
Site Photos — Before Work
Payment Schedule
Deposit to Schedule
$10,446.82
Upon signing
Final Payment
$10,446.81
Upon completion
Total Project Cost: $20,893.63 · Check is a preferred method · Pay by credit card: request.plastiq.com/pay-tidewater-home-improvement-llc (Virtual Affirm credit card not eligible)
Terms & Conditions

By agreeing to these Terms and Conditions, the customer acknowledges and accepts the outlined responsibilities and scope of work.

Scope: All work described in the Included Scope — clean up and removal of the old barrier, new 10-mil vapor barrier, structural repair (power post and beam), vent sealing, new crawlspace door, interior drainage, 2 sump pumps, dehumidifier, and electrical outlets. Any work not listed is not included unless agreed in writing.

Notes: Jobsite will be left clean once completed. Contractor is not responsible for damage caused inside the home while repairing the foundation.

Warranty: 12 months workmanship on the project · 2 years on the sump pumps · 12 months on the drainage system · 5 years on the dehumidifier.

Validity: valid until September 9, 2026.